Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Tesla Announces Partnership with SpaceX and xAI to Build the World's Largest Chip Factory with Annual Capacity of 1 Terawatt
Tesla posted on social platform X titled “TERAFAB: The Next Step Toward Galactic Civilization,” mentioning, “In partnership with SpaceX and AI company xAI, we are building the largest chip manufacturing plant in history (1 terawatt annual capacity), integrating logic chips, memory chips, and advanced packaging technology. To maximize solar energy utilization, we need to launch 100 million tons of equipment into space each year to capture solar energy.”
Tesla stated, “This requires ultra-large-scale deployment: the capability to launch millions of tons of supplies into orbit; solar-powered AI satellites; and millions of Tesla Megabot robots involved in construction. All these devices require chips: just Megabot robots need 100 to 200 gigawatts of chips, and the solar AI satellites need terawatt-level chip supplies.”
Tesla said, “This demand far exceeds the total capacity of all current global chip manufacturers, and even by 2030 (based on capacity growth forecasts), it will not be enough. We are building a trillion-dollar factory to bridge the gap between current chip capacity and future demand—a future belonging to interstellar civilization.”
Previously, Tesla CEO Elon Musk announced that the Terafab project aims to achieve trillion-watt-level computing power annually, with xAI, Tesla, and SpaceX participating.