Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Hainan's First Cross-River Power Tunnel Put Into Operation
Haikou’s new over-river tunnel for the 220 kV Binjiang Transmission and Substation Project and the 220 kV Guojiang Line A and B successfully energized, marking the official operation of Hainan’s first over-river power tunnel. This adds a new “energy artery” between Haikou’s city center and Jiangdong New Area, providing a practical example for constructing power transmission channels across rivers, seas, and densely populated urban areas in Hainan. The tunnel is an important power corridor connecting Jiangdong New Area with Haikou’s city center, with a total investment of 134 million yuan, a length of 1,050 meters, crossing the Nandu River. It is currently the longest, largest, and most technically challenging power tunnel in Hainan Province. (CCTV News)