💥 Gate Square Event: #PostToWinCGN 💥
Post original content on Gate Square related to CGN, Launchpool, or CandyDrop, and get a chance to share 1,333 CGN rewards!
📅 Event Period: Oct 24, 2025, 10:00 – Nov 4, 2025, 16:00 UTC
📌 Related Campaigns:
Launchpool 👉 https://www.gate.com/announcements/article/47771
CandyDrop 👉 https://www.gate.com/announcements/article/47763
📌 How to Participate:
1️⃣ Post original content related to CGN or one of the above campaigns (Launchpool / CandyDrop).
2️⃣ Content must be at least 80 words.
3️⃣ Add the hashtag #PostToWinCGN
4️⃣ Include a screenshot s
Celo Mainnet migration to Ethereum Layer 2 has been launched, block production is paused.
According to the Gate.io News bot and TheBlock report, the Celo Mainnet has begun executing its migration plan from Layer 1 to Ethereum Layer 2, and block production is currently paused. Once the migration is complete, Celo will operate on the Ethereum Layer 2 level, featuring native Ethereum cross-chain bridging capabilities, with block time optimized from 5 seconds to 1 second. Celo announced its first batch of partners, including institutions such as Aave, Fireblocks, Uniswap, and Yellowcard. Under the new architecture, the role of existing Celo validators will shift to decentralized sorters, maintaining single block finality.