Successfully passed through the Pearl River, Haizhu Bay Tunnel to achieve dual-line connection.

Jinshi data news on July 15th, this morning (July 15th), the super large diameter shield machine cutterhead successfully arrived at the receiving working well, thus realizing the double-line connection of the Haizhu Bay Tunnel. The Haizhu Bay Tunnel project is planned to be completed and opened to traffic in 2025. By then, the driving time from the central urban area of Guangzhou to Guangzhou South Station can be shortened to about 15 minutes, further improving the "hard connection" level of the infrastructure in the Guangdong-Hong Kong-Macao Greater Bay Area.

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
0/400
No comments
Trade Crypto Anywhere Anytime
qrCode
Scan to download Gate App
Community
English
  • 简体中文
  • English
  • Tiếng Việt
  • 繁體中文
  • Español
  • Русский
  • Français (Afrique)
  • Português (Portugal)
  • Bahasa Indonesia
  • 日本語
  • بالعربية
  • Українська
  • Português (Brasil)